Reliability
Cables get cut, storms roll in and satellites get busy. AfriSAT networks are engineered so that when one path fails, another is already carrying your traffic.
The principle
How failover works
Illustrative sequence. Failover behaviour is defined per site in the agreed routing policy.
How failover works
- FIBRE
- ACTIVE
- LEO
- STANDBY
- GEO
- STANDBY
01 · Normal
Fibre carries the load. Satellite stands ready.
On a typical day your site runs on its primary link. The satellite path is up, monitored and kept warm, so it is ready the moment it is needed.
- FIBRE
- DOWN
- LEO
- STANDBY
- GEO
- STANDBY
02 · Fibre cut
A cable is cut 200 km away.
Road works, floods, theft or a power failure on the route. The edge router sees the primary path fail and acts on the policy you agreed in advance.
- FIBRE
- DOWN
- LEO
- ACTIVE
- GEO
- STANDBY
03 · Reroute to LEO
Traffic moves to low Earth orbit.
Voice, video, payments and business applications shift to the LEO path automatically. Users keep working; most will never notice the change.
- FIBRE
- DOWN
- LEO
- BUSY
- GEO
- ACTIVE
04 · Overflow to GEO
Demand peaks. GEO takes the overflow.
If the LEO path is congested, obstructed or degraded, bulk transfers, updates and backups spill over to a geostationary link while real-time traffic stays on the fastest path.
- FIBRE
- ACTIVE
- LEO
- STANDBY
- GEO
- STANDBY
05 · Restored
Fibre returns. Everything goes back.
When the primary link is repaired, traffic returns to it under the same policy. The event, its duration and the paths used are logged for your report.
Illustrative sequence. Failover behaviour is defined per site in the agreed routing policy.
3D illustration · LEO, MEO and GEO shells
Orbit diversity
A busy LEO cell, an obstruction or a gateway outage affects one orbit; heavy rain on a Ka-band GEO link affects another. Rarely do both happen at once.
By pairing orbits at the same site, critical traffic keeps a second route through space, not just a second cable in the same trench.
- LEO for real-time traffic
- GEO as an independent second path
- MEO trunks for high-capacity sites, as part of our multi-orbit portfolio
Vendor diversity
Single-constellation networks inherit that constellation's outages, policy changes and commercial decisions. Multi-orbit designs can draw capacity from independent networks.
An SD-WAN edge treats each as one link among several, so switching between them is a routing decision, not a hardware project.
- Independent capacity sources where available
- One edge, one policy, one portal
- Reduced exposure to any single provider
Weather
Higher-frequency bands carry more data but lose signal in heavy rain. Ka-band is the most sensitive; Ku is affected less, and C-band hardly at all.
For critical sites we add link margin, use adaptive coding that slows down rather than drops out, and keep a Ku or C-band fallback for the worst storms of the wet season.
- Rain margin sized per climate zone
- Adaptive coding and modulation
- Ku or C-band fallback for critical links
Operations
Every terminal, path and policy reports into a single network operations view. Alarms are raised when performance drifts, not only when a link fails.
Engineers in Nairobi and across our regional hubs can diagnose remotely, re-route traffic and dispatch field support when a visit is needed.
- Continuous monitoring of every path
- Proactive alarms and remote diagnostics
- Event reports for each failover
In practice
Failover is automatic, policy-driven and logged. Your teams keep working, and you get a report of what happened and for how long.
Resilience checklist
Path diversity
Fibre, cellular, LEO, MEO and GEO combined per site.
Application policy
Agreed in advance: what moves, where and when.
Power planning
Terminal draw sized for solar, battery or generator.
Physical design
Clear sky view, mounting and cable runs surveyed.
Spares and logistics
Critical spares held close to remote sites.
Monitoring
Every path watched, alarmed and reported.
Security
Encrypted tunnels and segmented traffic across all paths.
Drills
Failover tested on schedule, not first on a bad day.
Does failover drop my calls or sessions?
With an SD-WAN edge and a warm standby path, most sessions survive a failover. Some long-lived connections may need to reconnect, depending on the application. We design and test the policy with you before go-live.
Why would I need two satellite orbits, not just one?
Each orbit fails differently. LEO cells can be congested or obstructed; GEO links can suffer heavy-rain fade in Ka-band. Combining orbits, and where possible operators, means one event is unlikely to affect every path at once.
What happens in a tropical downpour?
Higher-frequency bands such as Ka lose signal in very heavy rain. Designs for critical sites add margin, adaptive coding, and fallback to a lower-frequency Ku or C-band path, which is far less affected by rain.
How are service levels agreed?
Service levels are agreed per contract after an assessment of your sites, the orbits used and the support model. We set out availability, repair and reporting commitments in your proposal; we do not publish availability figures on the website.